Living Expenses 195

Korean Weekly Paid Rest Allowance Calculator

Estimate South Korea’s weekly paid holiday allowance from average scheduled work hours over 4 weeks, hourly wage, attendance on scheduled workdays, and a comparable worker’s scheduled workdays over 4 weeks.

Input

The example value has been entered. Check it immediately or change the value.

Integer · minimum 1 · maximum 1000000

Minimum 0 · Maximum 40

Integer · minimum 1 · maximum 28

Run with Ctrl or ⌘ + Enter

Input is processed in the browser. Refreshing returns a sample value.

Result

Check or change the value using the example value result.

Convenience estimate only. Assumes an employee covered by Korea’s Labor Standards Act, at least 15 scheduled work hours in an average 1-week period over 4 weeks, and full attendance on every scheduled workday in the relevant week. Enter the comparable employee’s actual number of scheduled workdays over 4 weeks. This estimate does not assess irregular schedules, leave, work suspension, lateness, early departure, the retirement week, statutory exceptions, ordinary wages, or other individual circumstances. Check with Korea’s Ministry of Employment and Labor or a qualified professional before calculating wages.

Share result

Share the tool link and result text together. No URL is included in the result. Check the below content and then share it.

Calculation·conversion criteria

Enter average weekly scheduled hours over 4 weeks, hourly wage, attendance on scheduled workdays, and a comparable worker’s scheduled workdays to estimate South Korea’s weekly paid holiday allowance.

Weekly paid holiday hours = min(8, average weekly scheduled work hours over 4 weeks × 4 ÷ the comparable worker’s scheduled workdays over those 4 weeks); weekly allowance = weekly paid holiday hours × hourly wage.

Input example

20‑hour weekly workday · 4 weeks of 20 days for comparison workers · $12,000 per hour · per task → 4‑hour overtime · $48,000

Assume 20 scheduled work hours per week, 20 scheduled workdays over 4 weeks for the comparable employee, an hourly wage of 12,000 won, and full attendance. Weekly paid rest hours = 20 × 4 ÷ 20 = 4 hours, for an estimated weekly allowance of 48,000 won. The monthly average is the weekly amount × 52 ÷ 12 = 208,000 won.

How to use

  1. Use the provided example value, or change items such as worker status under labor law, number of working days prescribed by the state, hourly rate (won), average working hours prescribed by the state over 4 weeks, and 4-week working days of comparable workers.
  2. Click Verify result and check the following result.
  3. Result can be copied if needed.

Frequently Asked Questions

Does meeting the 15-hour average weekly schedule threshold qualify for the Korean weekly paid holiday allowance?

Guidance from Korea’s Ministry of Employment and Labor describes the basic conditions as employee coverage under the Labor Standards Act, at least 15 scheduled work hours in an average 1-week period over 4 weeks, and full attendance on scheduled workdays in the relevant week. This calculator does not determine employee status or individual circumstances such as leave or work suspension.

Why are 4-week standard working hours for comparative workers needed?

Part-time employees may work different days from a regular employee doing the same work. Korea’s Ministry of Employment and Labor describes calculating the amount by dividing scheduled work hours over 4 weeks by the regular employee’s total scheduled workdays over the same period. Check the actual work schedules before entering the comparable employee’s workdays.

Is the monthly average adjustment the same as the salary statement?

No. It is a average reference value calculated by multiplying 52weeks ÷ 12months by the weekly expected amount. Actual payment weeks, contracts, holidays, business forms, and wage calculation methods are not considered, so check the pay stub and the Ministry of Labor and Employment.

Calculation criteria and reference materials

Verification of calculation criteria: · Calculation·verification principles · Report errors