Demand safety stock scenario
Safety stock=z×daily demand standard deviation×√lead days; scenario rows also show rounded-up units. Review your assumptions.
The example value has been entered. Check it immediately or change the value.
Input is processed in the browser. Refreshing returns a sample value.
Instructions and example
Safety stock=z×daily demand standard deviation×√lead days; scenario rows also show rounded-up units.
Standard deviation=8; lead days=5; z=1.65; safety stock≈29.516097303.
Uses a normal approximation with independent daily demand and fixed lead time; seasonality, correlation or lead variability can invalidate it.
Frequently asked questions
How does lead time change safety stock?
Safety stock=z×daily demand standard deviation×√lead days; scenario rows also show rounded-up units.
What buffer follows from the public standard deviation and z?
Standard deviation=8; lead days=5; z=1.65; safety stock≈29.516097303.
Calculation criteria and reference materials
- Peter L. King — Understanding safety stock and mastering its equations
Reference for demand variability and safety-stock modeling assumptions.
Verification of calculation criteria: · Calculation·verification principles · Report errors